It's been about two weeks since I've been able to make it to my studio. Last week was installation week at the gallery and with one thing or another, I was not able to make time in my schedule to get there.
I feel like this is a luxury week, though. Yesterday and today are scheduled as studio days.
It was a good studio day. That means that I made progress on the above painting. I gessoed some small panels and did the underpaintings for four small works.
Also, I am preparing for an open studio in September. I've invited three other artists to bring work to my studio for the open studio, so I am clearing some shelves for display. I have been trying to put in about a half hour of putting things away every time I go to the studio.
simultaneous with working on this piece, I have been constructing what, for me, is a large canvas. About 4' x 5'. I have a hand-held miter saw, which is slow work. Also, it's been really hot.
I finally got it stretched yesterday. The first coat of primer is on. On Friday, I will hopefully get it completely primed and will start painting next week.